To the present time, the works of engineering and geological research on the construction site of Social Dormitory for boarding school leavers have been completed.

16 exploration wells were drilled, in the result of which 26 soil samples were selected for laboratory evaluations of their qualities and composition.

Field documentation of drilled wells and results of laboratory investigations became the basis for drawing of the technical report of engineering and geological research, prepared by one of the contractors.

Фонд Саби

Author Фонд Саби

More posts by Фонд Саби

Русский

Қазақ тілі

English